This Old House - Season 19 Episode 12 The Milton House - 12
5.2030 minutes
A busy day at the site, as several weather-sensitive jobs are brought to completion. The crew puts in the final touches on the cedar clapboarding and window trim, explaining to us the fine points of keeping out the water. A new fiberglass bulkhead is installed, while painter Seth Knipe shows us the proposed colors for the main house. Inside we watch the insulation contractor Don Sawyer and crew spray a fast-expanding foam into the open stud bays of the media room, into the joist bays of the crawl space, and down into the cavities of the master bedroom's walls, whose old fiberglass has been pulled out. Outside landscape contractor Roger Cook supervises the installation of an in-ground sprinkler system to take care of the lawn-to-be, which a hydroseeding company sprays over the prepared soil. Elsewhere on the property, paving contractor Larry Torti shows us the new MacAdam driveway he's laying, using recycled paving as a base, liquid asphalt as a binder, and rice stone as a surface coat.